We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for Advance construction method.
ipros is IPROS GMS IPROS One of the largest technical database sites in Japan that collects information on.

Advance construction method - List of Manufacturers, Suppliers, Companies and Products | IPROS GMS

Advance construction method Product List

1~3 item / All 3 items

Displayed results

Small Diameter Pipe Underground Installation Work "Top Mall Method"

The "Top Mall Method" allows for extensive underground excavation without digging, facilitating the installation of various communication cables, gas pipelines, and water supply and drainage pipes. It also shortens construction time!

The Top Mall Method (Small Diameter Boring Method) is a non-excavation construction method that uses a drill boring machine to install new buried pipelines. It is suitable for construction in locations where excavation is difficult, such as national roads and railways, and is a clean and simple boring method that does not generate excavated soil due to its non-excavation nature. Additionally, it is equipped with a directional correction boring method. 【Features】 ■ Boring direction correction function: Capable of curved boring (Type M primarily focuses on straight boring) ■ Detection of the leading drill head: Can recognize angles, ensuring high safety and reliability ■ Compaction method: No ground subsidence occurs due to the non-excavation method ■ Short construction period: Approximately 30m to 50m per day per location, depending on soil conditions, pipe size, and working environment ■ Can be performed during the day due to minimal traffic disruption ■ Environmentally friendly clean method that does not generate industrial waste due to the lack of excavation *For more details, please download the PDF or contact us.

  • Other processing machines
  • Advance construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Piping construction: "Top Mall Method" for underground installation of pipelines without excavation! Construction case study.

We will excavate underground extensively without digging, and install communication cables, gas pipes, and pipes for water supply and drainage.

The Top Mall Method (Small Diameter Boring Method) is a non-excavation construction method for the installation of buried pipelines using a drill boring machine. It is suitable for construction in locations where excavation is difficult, such as national roads and railway tracks, and is a clean and simple boring method that does not generate excavated soil due to its non-excavation nature. Additionally, it is equipped with a directional correction boring method. 【Features】 ■ Boring direction correction function: Curved boring is possible (Type M primarily focuses on straight boring) ■ Detection of the leading drill head: Can recognize angles and other parameters, ensuring high safety and reliability ■ Compaction method: No ground subsidence occurs due to the non-excavation method ■ Short construction period: Approximately 30m to 50m per day per location, depending on soil type, pipe size, and working environment ■ Daytime construction is possible due to minimal traffic disruption ■ Environmentally friendly clean method that does not produce industrial waste as excavation is unnecessary *For more details, please download the PDF or contact us.

  • others
  • Advance construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

HDD Method (Guided Horizontal Drilling) - Solving Problems of Crossing National Highways, Railways, and Waterways

Piping and wiring burial system! Numerous achievements! Solutions for "crossing national roads, railways, waterways, and rivers"! "Challenging the creation of lifelines that traverse the Earth and underground."

With the acceleration and advancement of urban functions, the development of various lifelines such as water supply and sewage, electricity, gas, and communications is becoming increasingly important. The HDD method (Horizontal Directional Drilling) / TerraJet is a construction method that buries pipes and cables using non-excavation techniques, reducing traffic disruptions and soil disposal issues. It allows for clean and safe construction by detecting the construction position from above ground while advancing the drilling. In recent years, disasters have become more severe, and from the perspective of improving disaster resilience, the replacement of aging pipes and the transition to earthquake-resistant pipes are being promoted. The HDD method / TerraJet is gaining attention as a technique for burying water supply and sewage pipes, gas pipes, electric cables, and communication lines underground. In Europe and the United States, this method is known as NO-DIG, Trenchless, HDD (Horizontal Directional Drilling), no-dig, trenchless, and horizontal directional drilling. 【Features】 - Flexibility and adaptability - Shortened construction period - Economically low cost - Harmony with the natural environment - Safety For more details, please contact us or download the catalog.

  • others
  • Advance construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration